Sign In | Sign Up | Contact Us   
   
 
Design Services
Custom Design and Engineering
Re-Design for China Manufacturing
Prototyping and Sample Testing
Product Categories
Inquiry Basket
Items: 0      CNTR(20'/40'): 0



Home > Engineering
   Prototyping and Sample Testing
• Sample Lead Time: 5 to 7 Days with no toolings
• Sample Lead Time: 10 to 14 Days with toolings
• Sample Testing for Safety, Ergonomics, Capability, Durability
 
About Us | Contact Us | Privacy Policy | Payment | Shipment | Delivery | Order Quantity | Jobs Copyright © 2013 ChinaFixture.com All rights reserved